top of page

Revolutionizing Manufacturing

Dalgakiran’s Success with RBW Solutions

Dalgakiran - Turkey

160%

Productivity

60K €

Cost Reduction

0.8

years roı

BUSINESS CASE

Dalgakiran, a leading industrial machinery manufacturer, needed a solution to address its growing production demands and quality control challenges for its compressor panel and tank welding lines.

PROBLEM

Manual welding processes were slow and prone to errors, leading to costly reworks and increased operational costs.

SOLUTION

Integration of RBW’s RB-MIG systems with external axes integrations. 

  • First cell: RB-MIG on linear track for the panel line.

  • Second cell:  RB-MIG with a positioner for the compressor tank line.

VALUE 
  • 60% Reduction in welding times

  • 4 FTE Reduction, enhanced product quality, and streamlined production processes.

bottom of page