top of page

Revolutionizing Manufacturing
Dalgakiran’s Success with RBW Solutions
Dalgakiran - Turkey
160%
Productivity
60K €
Cost Reduction
0.8
years roı

BUSINESS CASE
Dalgakiran, a leading industrial machinery manufacturer, needed a solution to address its growing production demands and quality control challenges for its compressor panel and tank welding lines.
PROBLEM
Manual welding processes were slow and prone to errors, leading to costly reworks and increased operational costs.
SOLUTION
Integration of RBW’s RB-MIG systems with external axes integrations.
First cell: RB-MIG on linear track for the panel line.
Second cell: RB-MIG with a positioner for the compressor tank line.
VALUE
60% Reduction in welding times
4 FTE Reduction, enhanced product quality, and streamlined production processes.
bottom of page


